Greathouse Elementary

GREATHOUSE ELEMENTARY SCHOOL



LOCATION: MIDLAND, TEXAS
CLIENT: ASSOCIATED ARCHITECTS OF MIDLAND
SCOPE: 57,000 GROSS SQUARE FEET
CONSTRUCTION COST: $3.6m
DATE OF BID & COMPLETION: 1992, 1993


In 1993, Greathouse Elementary was completed in conjunction with a multi-million dollar bond package set forth by Midland ISD.

HVAC systems included a variable air volume system with parallel flow fan powered boxes. Cooling was provided from two 70-ton air-cooled chillers. Heating was provided from a high efficiency modular boiler to satisfy a total 2,238,000 Btuh heating load. Piping to all six air units utilized a four-pipe system. Control for all systems utilized a school standard direct digital control system.

Electrical systems included a new 480V, 2000A service and switchboard to provide lighting, power, and HVAC power requirements to the facility. Agnew Associates special systems in the design such as a fire alarm system with digital voice evacuation and an extensive classroom communications system with clock and bell controls. The facility also utilized LED exit signs and battery-supplied emergency lighting.

Agnew Associates provided the following services: HVAC, electrical and plumbing design, construction documents, and construction administration.

HOME | ABOUT US | OUR SERVICES | OUR CLIENTS | NEWS | LINKS | CAREERS

© 2000 Agnew Associates, Inc. All rights reserved.
Lubbock:
3223 South Loop 289, Ste. 424
Lubbock, Texas 79423
Phone:(806) 799-0753
Fax:(806) 799-2014
Austin:
14205 Burnet Road, Ste. 200
Austin, Texas 78728
Phone: (512) 828-0753
Fax: (512) 310-0750