Memorial Hospital

THIRD FLOOR RENOVATION,
MEMORIAL HOSPITAL AND MEDICAL CENTER



LOCATION: MIDLAND, TEXAS
CLIENT: RHOTENBERRY WELLEN ARCHITECTS
SCOPE: 13,000 GROSS SQUARE FEET
CONSTRUCTION COST: $850k
DATE OF BID & COMPLETION: 1996, 1997


In 1997, the original third floor area of Memorial Hospital and Medical Center was renovated. This renovation included newly designed patient rooms and nurse stations.

Agnew Associates designed HVAC systems that included individual, four-pipe fan coil units to serve each patient room and other designated areas. New piping was installed to the existing central plant. All of the new fan coil units were connected to the existing building automation system.

Plumbing design included standard services for toilets and treatment areas including de-ionized water. Medical gas systems included oxygen, vacuum, and compressed air.

For the electrical systems, Agnew Associates designed energy efficient fluorescent lighting with specialized halogen quartz exam lighting in treatment and examination rooms. Power distribution was designed to include emergency power from the facility's central distribution systems. Other electrical systems included fire alarm, communications, nurse call, and code blue systems.

Agnew Associates provided the following services: HVAC, electrical, and plumbing design, construction documents, and construction administration.

HOME | ABOUT US | OUR SERVICES | OUR CLIENTS | NEWS | LINKS | CAREERS

© 2000 Agnew Associates, Inc. All rights reserved.
Lubbock:
3223 South Loop 289, Ste. 424
Lubbock, Texas 79423
Phone:(806) 799-0753
Fax:(806) 799-2014
Austin:
14205 Burnet Road, Ste. 200
Austin, Texas 78728
Phone: (512) 828-0753
Fax: (512) 310-0750